Dusty.
So the bathroom is moving along slowly. The bulkhead is complete and smooth. Now the new heat/vent/light and vent/light are installed and wired. The new bucket for the wall light over the vanity is in and wired and I've started to patch the hole where the old ceiling light was. Next step is the tub.
3 Comments:
Is part of the concrete floor a different color?
That is a monster job. It's a double "Yowser!"
The "different part" is where the old monster hot-tub was. The rest was covered with the nastiest linoleum on earth. I beat myself to death with that scraper to get the bulk of the adhesive up. Just that part took four days.
Post a Comment
<< Home